• 2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking
  • 2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking
  • 2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking
  • 2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking
  • 2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking
  • 2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking

2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking

Transport Package: Factory Standard
Specification: Q235 Steel
Trademark: Mutrade
Origin: China
Customization:
Diamond Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
BDP
HS Code
84289020
Production Capacity
1000units/Month

Product Description

2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking2-6 Level Hydraulic Bdp Seriescar Parking System Puzzle Parking
According to the operation principle of our parking system, the periodical maintenance should be fulfilled as per the following four types:
A.Monthly inspection and maintenance
It should be done every two weeks after project starts to operate within the fifirst three months.
The equipment and safety devices should be clean, lubricated adjusted inspected. Especially, please pay more attention on the working status of main safety devices, careful inspection is necessary and please fifix any problem found out in the earliest time. Do inspection on every lubrication parts, and lubricate it if needed.
B.Quarterly inspection and maintenance
It should be done every three months after fifirst moths end.
All the transmission parts (steel cables, limit switches, motor in power pack, pulleys, guiding rails, etc.), safety devices and electrical control system should be inspected completely, and do necessary adjusting or fifixing work if needed.
C.Yearly inspection and maintenance
A technical inspection of whole equipment (including earth connection and withstand voltage of electrical parts, etc.) should be done every year, and customer need make estimation on working status of equipment and annual maintenance plan, fifix and replace the worn parts.
D.Adjusting test
The adjusting test with loading should be done every two years. The equipment could start to operate only after careful inspection on whole system if there is long time stop or any earthquake, fifire happening.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2022

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
222
Year of Establishment
2015-11-06