Bdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle Parking

Product Details
Customization: Available
Lifting Mechanism: Hydraulic
Type: Puzzle Parking System
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
222
Year of Establishment
2015-11-06
  • Bdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle Parking
  • Bdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle Parking
  • Bdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle Parking
  • Bdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle Parking
  • Bdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle Parking
  • Bdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle Parking
Find Similar Products

Basic Info.

Working Mode
Quasi Unmanned
Driving
Hydraulic
Falling Prevention Device
Pull-Type
The Vehicle Inlet and Outlet
Down
Design
Four Post
Certification
CE, ISO, TUV
Lift Mode
Hydraulic Cylinder
Voltage
DC 24V
Warranty
1 Year
Transport Package
Factory Standard
Specification
Q235 Steel
Trademark
Mutrade
Origin
China
HS Code
84289020
Production Capacity
1000units/Month

Product Description

Bdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle ParkingBdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle ParkingBdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle ParkingBdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle ParkingBdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle ParkingBdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle ParkingBdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle ParkingBdp High End Hydraulic Automated Multi-Level Vertical Car Puzzle Parking
According to the operation principle of our parking system, the periodical maintenance should be fulfilled as per the following four types:
A.Monthly inspection and maintenance
It should be done every two weeks after project starts to operate within the fifirst three months.
The equipment and safety devices should be clean, lubricated adjusted inspected. Especially, please pay more attention on the working status of main safety devices, careful inspection is necessary and please fifix any problem found out in the earliest time. Do inspection on every lubrication parts, and lubricate it if needed.
B.Quarterly inspection and maintenance
It should be done every three months after fifirst moths end.
All the transmission parts (steel cables, limit switches, motor in power pack, pulleys, guiding rails, etc.), safety devices and electrical control system should be inspected completely, and do necessary adjusting or fifixing work if needed.
C.Yearly inspection and maintenance
A technical inspection of whole equipment (including earth connection and withstand voltage of electrical parts, etc.) should be done every year, and customer need make estimation on working status of equipment and annual maintenance plan, fifix and replace the worn parts.
D.Adjusting test
The adjusting test with loading should be done every two years. The equipment could start to operate only after careful inspection on whole system if there is long time stop or any earthquake, fifire happening.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier